Updation for Estimate for Irrigation Tank
Abstract of Quantity
District:
-District-
Bilaspur
Bilaspur
Chamba
Chamba
Hamirpur
Hamirpur
Kangra
Kangra
Kinnaur
Kinnaur
Kullu
Kullu
Lahaul & Spiti
Lahaul & Spiti
Mandi
Mandi
Shimla
Shimla
Sirmour
Sirmour
Solan
Solan
Una
Una
Block:
-Block-
Panchayat:
-Panchayat-
Village
-Village-
Name of Scheme:
--Select Items--
Irrigation Tank
Implement Agency Name
Present Labour Rate
-Select ID-
Mustroll No.
Upload Image
Date
Start Date of Mustroll
JEE
End Date of Mustroll
Sanction No. & Date
Sanction Amount
Distance(in Km.)
Rate(Rs.)
Market Rate of Material
Sr. No.
Item
Mechanical Lead
Head Load Lead
Mechanical
Head Load
Unit
In Rupees
1.
Cement (Bags)
Bags
2.
Sand (CuM)
CuM
3.
Agregate 20mm(CuM)
CuM
4.
Agregate 40mm (Cum)
CuM
5.
Stone (CuM)
CuM
SR. No.
Description of Item
No.
Length
Breadth
Height/ Depth
Quantity
1.
Excavation in Foundation treanches etc. in
earth work lift upto 1.5 metres, including
dressing of bed disposing excavated earth upto
20m lead.
2.
Stone Soling properly hand packed filling
intrestics with spalls earth
etc. and hand raming complete.
3.
P/L cement concrete 1:4:8(1 Cement : 4 Sand : 8
Well graded stone aggregate upto 40mm nominal
size and curing complete in foundation
and plingth.
4.
R/R Masonary with hard stones of approved
quality in cement mortar 1:4(1 Cement : 4 Sand)
in foundation and plingth.
Long Wall
Short Wall
Deduct Core wall Quantity
Total
5.
20mm Cement Plastering on the rough side of
stone masonary in cement mortar
1:4 (1 Cement : 4 Sand)
Internal
External
Total
6.
Providinga and laying cement concrete
1:2:4(1 Cemnt : 2 Sand : 4 well
graded stone agregate 20mm nominal size)
curing compete excludibg cost of
form work in foundation and plinth.
Base
Core Wall (a) Long wall
Core Wall (b) Short wall
Total
National Rural Employment Guarantee Act/Scheme(NREGS)
Abstract of Cost
District:
Block:
Panchayat :
Village :
Name of Scheme :
Name of Workkrk
SR. No.
Description of Item
Qty
Unit
Rate
Per
Amount
Labour
Through
Labour
Through
1.
Excavation in Foundation
treanches etc. in
earth work lift
upto 1.5 metres,
including dressing of
bed disposing excavated earth
upto 20m lead.
CuM.
CuM
2.
Stone Soling properly hand
packed filling intrestics with
spalls earth etc.
and hand raming
complete.
CuM.
CuM
3.
P/L cement concrete
1:4:8(1 Cement : 4 Sand
: 8 Well graded stone
aggregate upto 40mm
nominal size and curing
complete in foundation and
plingth.
CuM.
CuM
4.
R/R Masonary with hard
stones of approved quality
in cement mortar 1:6(1
Cement : 6 Sand) in
foundation and plingth.
CuM.
CuM
5.
20mm Cement Plastering on
the rough side of
stone masonary in
cement mortar 1:4(1
Cement : 4 Sand)
SqM.
SqM
6.
Providinga and laying cement
concrete 1:2:4(1 Cemnt
: 2 Sand : 4 well graded
stone agregate 20mm
nominal size) curing
compete excludibg cost
of form work in
foundation and plinth.
SqM.
SqM
Total
Less 15%(10% Contractor Profit + 5% Overhead Charges)
Add for extra cost of Material as per "Annexure A" attached
Add for extra carriage of material as per "Annexure B"
Add for extra labour
Grand Total
National Rural Employment Guarantee Act/Scheme(NREGS)
National Rural Employment Guarantee Act/Scheme(NREGS) Annexure-A
District:
Block :
Panchayat :
Village :
District:
Block :
Panchayat :
Village :
Name of Scheme :
Name of Scheme :
Consumption of Material Statement
Extra Cost of Material Statement
Sr. No.
Item of Work
Quantity
Cement (Bags)
Sand (CuM)
Agregate 20mm (CuM)
Agregate 40mm (Cum)
Stone (CuM)
SR. No.
Item
Quantity
Unit
Market Rate
Schedule Rate
Difference
Extra Cost
1.
Stone Soling properly hand
packed filling intrestics
with spalls earth etc.
and hand raming
complete.
1.
Cement (Bags)
Bags
2.
P/L cement concrete
1:4:8(1 Cement : 4
Sand : 8 Well graded
stone aggregate upto
40mm nominal size and
curing complete in
foundation and plingth.
2.
Sand(CuM)
CuM
3.
R/R Masonary with hard
stones of approved quality
in cement mortar
1:4 (1 Cement : 4
Sand) in foundation and
plingth.
3.
Agregate 20mm (CuM)
CuM
4.
20mm Cement Plastering
on the rough side
of stone masonary
in cement mortar 1:4
(1 Cement : 4 Sand)
4.
Agregate 40mm (CuM)
CuM
5.
P/L CC flooring 1:2:4
(1 Cemnt : 2 Sand : 4
well graded stone
agregate 20mm nominal
size)
5.
Stone (CuM)
CuM
Total
Total
Annexure B
Carriage Statement
Sr. No.
Item
Quantity
Unit
Distance in KM
Rate
Carriage Amount
Mechanical
Head Load
Mechanical
Head Load
Mechanical
Head Load
Total
1.
Cement (Bags)
Bags
2.
Sand (CuM)
CuM
3.
Agregate 20mm (CuM)
CuM
4.
Agregate 40mm (CuM)
CuM
5.
Stone (CuM)
CuM
Total
Deduct 15%(10% for contractor profit and 5% for overhead charges
Note: Extraction, collection, stacking and carriage of material should preferably be done by manual labour.