HP's Green Growth and Sustainable Development Programme 
 in assistance with The World Bank
MIS for Monitoring of Results Indicators of HPDPL
Update
ENERGY SECTOR
Result Indicator:-
Review by Panel of experts of State's compliance with environmental and social/economic development policies supported by this program and E.P. Act of Gol
DateDescriptionOutcomeReference
NULLSatlujIn order to review the Draft report on CEIA study, the PESE (Panel of Environment & Social Experts) members, Sh. D.C. Khanduri (Environmental Expert) and Dr. Reshmy Nair (Social Expert) visited all the three zones as defined for the CEIA study. Zone-I Visit (Kuzum to Khab) w.e.f. 12th August 2014 to 18th August 2014. Zone-II Visit (Nathpa to Khab) w.e.f 07thDecember 2013 to 11th December 2013. Zone-III Visit (Rampur to Koldam) w.e.f 28thMay 2014 to 1st June 2014. During their visits, PESE member attended three No. Satluj Basin Stakeholder & Public Consultation meeting at Jhakri, Reckong Peo, Pooh and other small village/Panchyat level public consultation meetings (about 27) at various places in the Satluj Basin followed by consultation with respective Local Administration, NGO’s and respective Project Proponents. Document is not available to upload
NULLChenabThe same PESE have been engaged for the review of ongoing CEIA study of Chenab river Basin. On the course of CEIA study, The Chenab Basin stakeholders and Public consultant meeting have recently been successfully conducted by DoE at Keylong on 28.10.2014, at Udaipur on 29.10.2014 and at Killar on 31.10.2014 which were attended by large number of stakeholders from Project Affected Areas of the Proposed Projects in Chenab Basin, various representative of NGO’s, Project Proponents and Local administration, Officers of DoE, other concerned department and two member of peer group. A very positive response have been received from the people of Lahaul of Distt. Lahaul & Spiti and Pangi area of Chamba Distt, where in Projects have been proposed for construction. No resistance have been found from the stakeholders for the construction of Hydro Electric Projects in Chenab Basin except from the people of Project Affected Area of Gyspa Dam. Document is not available to upload
Update Frequency:-Quarterly
 
Result Indicator:-
Avoided Thermal Generation of 11,300,000 MWh by FY 2014 against a 2011 baseline
DateYear Energy
Generation (in MWh)
Capacity (in MW)Thermal Generation Avoided (in MWh)Capacity BuildingReference
Base LinePrevious QuarterCurrent QuarterCumulativein MWPeriod
NULL2014109620000243631369365NULL2436NULLNULL01 Jan 2011 to 31 Dec 2014 Energy_Upload\world bank project detail.pdf
Update Frequency: Quarterly
Note: Baseline energy generation 31,369,365 MWh against 6970.97 MW. Average energy generation per MW = 4.5 MU
 
Long-term outcome:
10% reduction in the lead time required from start of bidding to commissioning of hydropower project by 5 years
** Currently no data available **
Update Frequency: Annually
 
Long-term outcome:
Increased contribution of hydropower generation by 10 GW by 2023 contributing to the fiscal health of the state
** Currently no data available **
Update Frequency: Annually
 
Result Indicator:
Finalization and disclosure of list of eligible families for cash transfers under new LADF guidelines for the first hydro project by FY 2014 illustrated through AGiSAC
Update Frequency: Annually
 
Result Indicator:
Local area development works for 75 percent of funds deposited to the LADF as of March 31, 2012 in the amount of 1500 million rupees (US$ 30 million) are approved by Local Area Development Committees (LADCs) by March 2013.
** Currently no data available **
Update Frequency: Annually
 
Result Indicator:
Cash transfar of 50 million rupees (US$ 1 million) transferred to project affected peoples by 2014
Update Frequency: Annually
 
Result Indicator:
Target (December-2014) :5000 People
Number of People benefiting from direct cash transfer program under LADF policy
** Currently no data available **
Update Frequency: Annually
Note: Disclosure in Reference.
 
Result Indicator:
Tons of GHG emissions reduced or avoided
** Currently no data available **
Update Frequency: Annually
 
Result Indicator:
Volume of direct finance leveraged through CTF funding-disaggregated by public and private finance
** Currently no data available **
Update Frequency: Annually
 
Result Indicator:
Installed capacity (MW) after CTF Interventions
** Currently no data available **
Update Frequency: Annually
Note: Baseline year: 2011
 
Result Indicator:
Annual Energy Savings after CTF interventions
** Currently no data available **
Update Frequency: Quarterly
 
Result Indicator:
Improvements in energy efficiency of designated entities and consumers
** Currently no data available **
Update Frequency: Quarterly